Index:
Volume 1 - NTS
Volume 2 - ES
Volume 3 - Appendices
Volume 4 - Figures
Volume 5 - LVIA Visualisations
Planning Statement
Pre-Application Consultation Report


Talladh-A-Bheithe Estate Boundary



The site location and site boundary
 

OUR PROPOSALS

Please find below our application, submitted to the Scottish Government in June 2014.


Volume 1 - NTS

Non-Technical Summary


Volume 2 - ES

Chapter 1 - Introduction
Chapter 2 - Design Evolution and Alternatives
Chapter 3 - Proposed Development
Chapter 4 - Construction and Decommissioning
Chapter 5 - EIA Process and Methodology
Chapter 6 - Planning and Policy Context
Chapter 7 - Landscape and Visual Impact Assessment
Chapter 8 - Ecology
Chapter 9 - Ornithology
Chapter 10 - Historic Environment
Chapter 11 - Geology Hydrology & Hydrogeology
Chapter 12 - Noise
Chapter 13 - Electromagnetic Interference, Aviation and Shadow Flicker
Chapter 14 - Traffic and Transport
Chapter 15 - Socio-Economics Assessment
Chapter 16 - Carbon Balance Assessment
Chapter 17 - Summary of Environmental Effects
Erratum ES Vol 2 – Chapter 3 - Proposed Development


Volume 3 - Appendices

Chapter 4 Construction and Decommissioning
Appendix 4.1 Borrow Pit Search Report

Chapter 7 Landscape and Visual
Appendix 7.1 LVIA Methodology
Appendix 7.2 Preliminary Review of Landscape Character Types
Appendix 7.3 Viewpoint Assessment
Appendix 7.4 Assessment of SNH Wild Land Designation

Chapter 8 Ecology
Appendix 8.1 Vegetation Assessment
Appendix 8.1 Vegetation Assessment - Figures
Appendix 8.2 Mammal Assessment
Appendix 8.2 Mammal Assessment - Figures

Chapter 9 Ornithology
Appendix 9.1 Ornithological Assessment
Appendix 9.1 Ornithological Assessment - Figures Part 1
Appendix 9.1 Ornithological Assessment - Figures Part 2
Appendix 9.1 Ornithological Assessment - Figures Part 3
Appendix 9.2 Outline Habitat Management Plan
Appendix 9.2 Outline Habitat Management Plan App A Moorland Management Plan
Appendix 9.2 Outline Habitat Management Plan App B Muirburn Management Report
Appendix 9.2 Outline Habitat Management Plan App C Figure 1 Estate Boundary
Appendix 9.2 Outline Habitat Management Plan App C Figure 2 Habitat Map
Appendix 9.2 Outline Habitat Management Plan App C Figure 3 Golden Eagle Prey Resource
Appendix 9.2 Outline Habitat Management Plan App C Figure 4 Peat Depth Map
Appendix 9.2 Outline Habitat Management Plan App C Figure 5 Geomorphology

Chapter 10 Historic Environment
Appendix 10.1 - 10.2 - Cultural Heritage Technical_Appendices
Plates

Chapter 11 Geology, Hydrogeology and Hydrology
Appendix 11.1 Peat Stability Risk Assessment
Appendix 11.2 Peat Management Plan
Appendix 11.3 Watercourse Crossing Assessment

Chapter 13 Electromagnetic Interference, Aviation and Shadow
Appendix 13.1 Aviation & Communication Responses

Chapter 14 Access, Traffic and Transport
Transport Statement

Chapter 16 Carbon Balance Assessment
Appendix 16.1 Table of Calculation Assumptions
Appendix 16.2 Laboratory Test Certificates
Appendix 16.3 (REPORT - 1058298 - 1 - C) - 1


Volume 4 - Figures

Chapter 1 Introduction
Figure 1.1 The Estate Boundary
Figure 1.2 The site location and site boundary

Chapter 2 Design Evolution and Alternatives
Figure 2.1 - 2.2
Figure 2.3 - 2.4
Figure 2.5 - 2.6
Figure 2.7 - 2.8
Figure 2.9 - 2.10
Figure 2.11 - 2.12
Figure 2.13 - 2.14
Figure 2.15 - 2.16

Chapter 4 Construction and Decommissioning
Figure 4.1 Site Layout
Figure 4.2 Upgraded Estate Roads
Figure 4.3 Site Access Tracks
Figure 4.4 Typical Wind Turbine
Figure 4.5 Typical Wind Turbine Foundation
Figure 4.6 Typical Crane Hardstanding
Figure 4.7 Typical Substation Plan
Figure 4.8 Typical Substation Elevations
Figure 4.9 Typical Construction Compound
Figure 4.10 Typical Track Cross Drainage

Chapter 7 Landscape and Visual
Figure 7.1 Site Location and LVIA Study Area (35km)
Figure 7.2 Other Existing and Proposed Windfarms within 70km
Figure 7.3 Landscape Designations and Policy
Figure 7.4 Landscape Character Types within 35km
Figure 7.5 Landscape Character Types within 10km
Figure 7.6 Local Landscape Context
Figure 7.7 Topography Plan
Figure 7.8 Principal Visual Receptors within 35km
Figure 7.9 Blade Tip Height ZTV to 35km
Figure 7.10 Hub Height ZTV to 35km
Figure 7.11 Blade Tip Height ZTV to 35km (NE Quadrant)
Figure 7.12 Blade Tip Height ZTV to 35km (SE Quadrant)
Figure 7.13 Blade Tip Height ZTV to 35km (SW Quadrant)
Figure 7.14 Blade Tip Height ZTV to 35km (NW Quadrant)
Figure 7.15 Blade Tip Height ZTV to 10km (Site Centred)
Figure 7.16 Hub Height ZTV to 35km (NE Quadrant)
Figure 7.17 Hub Height ZTV to 35km (SE Quadrant)
Figure 7.18 Hub Height ZTV to 35km (SW Quadrant)
Figure 7.19 Hub Height ZTV to 35km (NW Quadrant)
Figure 7.20 Hub Height ZTV to 10km (Site Centred)
Figure 7.21 Viewpoint Location Plan
Figure 7.22 LCTs within 35km Overlaid on Blade Tip Height ZTV
Figure 7.23 Principal Visual Receptors within 35km Overlaid on Blade Tip Height ZTV
Figure 7.24 Landscape Policy and Designations overlaid on Blade Tip Height ZTV
Figure 7.50 Other Existing and Proposed Wind Farms in Cumulative Assessment
Figure 7.51 Cumulative ZTV - Griffin
Figure 7.52 Cumulative ZTV - Stronelairg
Figure 7.53 Cumulative ZTV - Calliacher
Figure 7.54 Cumulative ZTV – Braes of Doune
Figure 7.55 - 7.58 Cumulative Wireframes

Chapter 8 Ecology & Chapter 9 Ornithology
Figure 8.1 - 9.3

Chapter 10 Historic Environment
Figure 10.1 Heritage Constraints
Figure 10.2 Blade Tip ZTV and Key Heritage Assets

Chapter 11 Geology, Hydrogeology and Hydrology
Figure 11.1 Hydrology Overview
Figure 11.2 Hydrological Characteristics
Figure 11.3 Flow Accumulation and Direction
Figure 11.4 Topographic Wetness Index
Figure 11.5 Permeability of Bedrock and Superficial Geology
Figure 11.6 Groundwater Flooding Potential

Chapter 12 Noise
Figure 12.1 Noise Receptors

Chapter 13 Electromagnetic Interference, Aviation and Shadow
Figure 13.1 Aviation Constraiints
Figure 13.2 Existing Infrastructure


Volume 5 - LVIA Visualisations

Visualisations 1 to 15
Visualisations 16 to 25


Planning Statement

Planning Statement


Pre-Application Consultation Report

PAC Report


Environmental Statement Contents


 
 

Further information

E: talladhabheithe@communityline.org
T: 0203 128 6321
 
     
ss